.....Advertisement.....
.....Advertisement.....

Today's News

  • Adult Education Graduates
  • Luellen issues results of clerk’s office 2010 audit

    State Auditor Crit Luallen has released the audit of the 2010 financial statement of Trimble County Clerk, Jerry Powell. State law requires the Auditor to conduct annual audits of county clerks and sheriffs.

    The audit found that the Clerk’s financial statement presents fairly the revenues, expenditures, and excess fees of the Trimble County Clerk in conformity with the regulatory basis of accounting.

  • Senior Fishing Trip
  • Mom and Daughter Look Alike Winners
  • Trimble County Fair Regatta Float
  • Trimble County Sheriff's Log July 13, 2011

    SHERIFF’S CALL LOG

    Tuesday, July 5
    12:13 p.m., personal injury accident, Gills Ridge Rd
    2:05 p.m., criminal mischief complaint, 500 block Perkinson Ln
    4:06 p.m., warrant served, 100 block Al’s Dr
    5:47 p.m., processed papers, 100 block Windy Ridge Rd
    7:13 p.m., processed papers, 200 block Pond Ct
    7:18 p.m., processed papers, 7000 block U.S. 42W
    7:29 p.m., processed papers, Shepherd Ln
    8:24 p.m., processed papers, 1100 block U.S. 42E
    8:31 p.m., processed papers, 600 block U.S. 42W

  • News of Public Record 07-13-11

    Items published in court news are public record.
    The Trimble Banner publishes all misdemeanors, felonies and small-claims judgments recorded in district court, as well as all civil suits recorded in circuit court. Juvenile court cases are not published.

    Crime reports are provided by local law enforcement agencies. Charges or citations reported to The Trimble Banner do not imply guilt.

    The following cases were heard in court the week of July 4 through July 8, 2011.

    Felony

  • Milton-Madison Bridge reduced to one lane Friday

    The Milton-Madison Bridge will be reduced to one lane on Friday, July 15th from 9:30 a.m. until 3:00 p.m.  Engineers from the Kentucky Transportation Cabinet will be monitoring items on the bridge that were highlighted in the 2009 in-depth inspection.

    In 2010, the Cabinet implemented an in-house two-month inspection frequency to review these locations and make sure repairs are not warranted. The goal is to keep the Milton-Madison Bridge operational during the superstructure replacement project.

  • Wise’s Landing church enjoying renewal

    Pleasant View Baptist Church, located in the Ohio River Valley at Wise’s Landing in southwest Trimble County, is alive and well.

  • Bridge progresses on multiple levels

    Construction of the temporary work platform at the Milton staging area for construction of the new Milton-Madison bridge is expected to be completed this week. Meanwhile, strengthening of the existing bridge piers continues with steel reinforcement and crack repair. Scaffolding is also being installed on the three water piers that will be retained for the new superstructure. Materials to be used in construction of temporary access ramps on both sides of the river are being delivered to the work sites.